Data center power consumption in the US: official estimates, state sales and grid forecasts

A dated ledger of every official estimate, paired with measured EIA sales growth by state and the latest grid operator and utility filings.
A high-voltage substation serving a large data center building.
Data
LBNL 2025 Update (June 2026); EIA Form EIA-861M state sales (August 2026 data)
Period
Estimates 2014 to 2024, forecasts to 2030 and beyond; sales January 2019 to August 2026
Release used
2026-10-23
Next release
End of November 2026 (EIA-861M, September 2026 data)
Geography
United States, 50 states and DC, ERCOT, PJM, Dominion and Georgia Power service areas
Sources
32 (26 official)
The answer

US data center power consumption reached an estimated 192 TWh in 2024, or 4.7% of all US electricity, according to the Lawrence Berkeley National Laboratory update published in June 2026. Its Reference Case reaches 649 TWh (11.8%) by 2030. Measured commercial electricity sales rose 176.0 TWh between 2019 and the 12 months to August 2026, led by Texas and Virginia.

192 TWhUS data center electricity use in 2024, 4.7% of US consumption (LBNL 2025 Update, June 2026)[1]
649 TWhLBNL Reference Case for 2030, 11.8% of forecast US electricity; range 521 to 843 TWh[1]
+176.0 TWhGrowth in US commercial-sector electricity sales, 2019 to the 12 months ending August 2026 (EIA-861M)[5]
438 GWLarge loads seeking connection to the Texas grid at ERCOT's June 2026 board update, up from 56 GW in September 2024[25][21]

Data center power consumption estimates: 176 TWh in 2023, 192 TWh in 2024

Every national figure for US data center electricity use is a model estimate. Lawrence Berkeley National Laboratory's bottom-up model, funded by DOE, is the federal reference; its June 2026 update raised the near-term outlook and moved the horizon to 2030.

LBNL's 2025 Update estimates US data center electricity use at 192 TWh in 2024, 4.7% of total US electricity consumption (LBNL 2025 Update). The figure excludes cryptocurrency mining. LBNL treats 2024 as the last historical year because its server shipment data run only through the first three quarters of 2025.

The earlier December 2024 report put 2023 use at 176 TWh, 4.4% of US consumption, up from 76 TWh (1.9%) in 2018 and about 60 TWh a year in 2014 to 2016 (LBNL 2024 report). DOE's release for that report gave 58 TWh for 2014 (DOE). The 2025 Update revised earlier years slightly downward after lower reported GPU shipments for 2023 and 2024.

Official and institutional estimates of US data center electricity use, by publication date Download CSV
Publisher and reportPublishedYear coveredTypeElectricity (TWh)Share of U.S. electricityMethod
Brown et al., report to Congress (cited by LBNL 2024)20072006Historical estimate611.5%Bottom-up model
Shehabi et al., LBNL (cited by LBNL 2024)20162014Historical estimate701.8%Bottom-up model
LBNL 2024 report, as summarised by DOEDec 20242014Historical estimate58not statedBottom-up model
LBNL 2024 reportDec 20242018Historical estimate761.9%Bottom-up model
LBNL 2024 reportDec 20242023Historical estimate1764.4%Bottom-up model
LBNL 2024 report, low scenarioDec 20242028Forecast3256.7%Scenario range
LBNL 2024 report, high scenarioDec 20242028Forecast58012.0%Scenario range
IEA Energy and AI (derived: 45% of 415 TWh)20252024Historical estimate186.8not statedIEA model; U.S. share of global total
IEA Energy and AI, Base Case (derived: 2024 plus 240 TWh)20252030Forecast426.8not statedIEA scenario
LBNL 2025 UpdateJun 20262024Historical estimate1924.7%Bottom-up model, revised shipments
LBNL 2025 Update, Reference CaseJun 20262028Forecast464not statedBottom-up scenario
LBNL 2025 Update, Reference CaseJun 20262030Forecast64911.8%Bottom-up scenario
LBNL 2025 Update, Compounded Uncertainty lowJun 20262030Forecast5219.5%Bottom-up scenario
LBNL 2025 Update, Compounded Uncertainty highJun 20262030Forecast84315.3%Bottom-up scenario
EPRI 2026, as cited by LBNL 2025 Update (Tier 2)20262030Forecast390 to 800not statedScenario range

Historical values are model estimates, not metered data. IEA rows are derived from IEA shares; EPRI is quoted by LBNL. Shares use each publisher's own US total.

Source: [1][3][4][13][14] Lawrence Berkeley National Laboratory for the U.S. Department of Energy; Lawrence Berkeley National Laboratory for the U.S. Department of Energy; U.S. Department of Energy; International Energy Agency; International Energy Agency

LBNL estimates of US data center electricity use

TWh; 2014 to 2024 are model estimates, 2028 and 2030 are Reference Case forecasts

LBNL estimates of US data center electricity useBar chart of US data center electricity use: 58 TWh in 2014, 76 TWh in 2018, 176 TWh in 2023, 192 TWh in 2024, a 464 TWh Reference Case for 2028 and 649 TWh for 2030.0200400600800TWh58.0201476.02018176202319220244642028 (Ref.)6492030 (Ref.)

Source: LBNL 2024 report (2018, 2023) and 2025 Update (2024, 2028, 2030); DOE release (2014)

LBNL's Reference Case grows 22% from 2024 to 2025 and 29% from 2025 to 2026, then at a compound annual rate of 21% to 649 TWh in 2030. Applying those rates to 192 TWh gives about 234.2 TWh for 2025 and 302.2 TWh for 2026 (derived). The 2028 Reference Case of 464 TWh sits close to the 452.5 TWh midpoint of the 2024 report's 2028 range.

LBNL 2025 Update scenarios for 2030 Download CSV
Scenario (LBNL 2025 Update)2030 electricity (TWh)Difference from Reference CaseShare of 2030 U.S. electricity
Reference Case649none11.8%
Consolidated Deployment578-10.8%10.5%
High ASIC664+2.4%12.1%
Low Accelerator Lifetime590-9.1%10.7%
High Inference Energy782+20.6%14.2%
Compounded Uncertainty, low521-19.6%9.5%
Compounded Uncertainty, high843+29.9%15.3%

Share of 2030 US electricity uses NERC's 2025 LTRA forecast as the denominator.

Source: [1] Lawrence Berkeley National Laboratory for the U.S. Department of Energy

TWh and GW: A terawatt-hour (TWh) is one billion kilowatt-hours of energy used over a period. A gigawatt (GW) is a rate of power draw. LBNL's 192 TWh for 2024 equals an average draw of about 21.9 GW across the year (derived: 192 TWh divided by 8,760 hours).

Commercial electricity sales rose 176.0 TWh since 2019, led by Texas and Virginia

Measured sales do not isolate data centers, but the states with large data center clusters lead national growth in commercial-sector electricity sales. EIA itself attributes Virginia's growth largely to data centers.

US commercial-sector retail electricity sales were 1,360.9 TWh in 2019 and 1,536.9 TWh in the 12 months from September 2025 to August 2026, a rise of 176.0 TWh or 12.9% (EIA-861M). Total retail sales across all sectors rose 311.8 TWh (8.2%) over the same span, so the commercial sector supplied 56.5% of the increase.

Texas added 42.2 TWh of commercial sales and Virginia added 34.2 TWh. Together they account for 43.4% of the national commercial increase. Virginia's commercial sales rose 63.3%, from 54.0 TWh to 88.2 TWh. Fourteen of the 51 jurisdictions (50 states and DC) sold less commercial electricity in the latest 12 months than in 2019.

Commercial-sector electricity sales growth by state, 2019 to the latest 12 months (top 20 by TWh) Download CSV
RankStateCommercial sales 2019 (TWh)Commercial sales Sep 2025 to Aug 2026 (TWh)Change (TWh)Change (%)Total retail sales change (%)Named as data center state in brief
1Texas142.0184.2+42.2+29.7%+24.4%yes
2Virginia54.088.2+34.2+63.3%+26.0%yes
3Ohio46.063.2+17.2+37.3%+12.6%yes
4Georgia47.459.7+12.3+25.9%+12.3%yes
5Arizona29.441.2+11.8+40.0%+24.9%yes
6Oregon16.428.2+11.7+71.5%+23.6%yes
7Oklahoma20.128.3+8.2+40.7%+16.5%no
8Nebraska9.516.8+7.3+77.4%+30.6%no
9Florida96.6101.8+5.2+5.4%+8.5%no
10South Carolina22.227.4+5.2+23.5%+8.1%no
11Washington29.333.9+4.6+15.9%-1.1%no
12Indiana23.528.0+4.4+18.9%+3.8%no
13North Dakota7.011.5+4.4+62.9%+40.8%no
14Utah11.915.5+3.6+30.8%+16.5%no
15Nevada11.714.9+3.3+27.9%+12.2%no
16Wyoming3.65.9+2.3+65.1%+4.8%no
17North Carolina49.251.0+1.8+3.6%+4.1%no
18Iowa12.313.6+1.3+10.5%+18.3%yes
19Kentucky19.620.6+1.0+5.2%+0.5%no
20Missouri30.131.1+1.0+3.2%+2.5%no
United States (50 states and DC)1,360.91,536.9+176.0+12.9%+8.2%

Latest 12 months is September 2025 to August 2026; January to August 2026 are preliminary. 'Named as data center state' follows the seven states listed in this report's brief, not an EIA classification. The full 51-row file is in scripts/state_sales_all_states.csv.

Source: [5][6] U.S. Energy Information Administration; U.S. Energy Information Administration

Growth in commercial electricity sales by state

Change in TWh, calendar 2019 to September 2025 through August 2026; top 15 states

Growth in commercial electricity sales by stateHorizontal bar chart: Texas added 42.2 TWh of commercial electricity sales since 2019, Virginia 34.2 TWh, Ohio 17.2 TWh, Georgia 12.3 TWh, Arizona 11.8 TWh and Oregon 11.7 TWh.TWhTexas42.2Virginia34.2Ohio17.2Georgia12.3Arizona11.8Oregon11.7Oklahoma8.2Nebraska7.3Florida5.2South Carolina5.2Washington4.6Indiana4.4North Dakota4.4Utah3.6Nevada3.3

Source: U.S. EIA, Form EIA-861M sales and revenue file (August 2026 release, 2026 months preliminary)

Percentage change in commercial electricity sales, 2019 to latest 12 months

Calendar 2019 versus September 2025 through August 2026

Percentage change in commercial electricity sales, 2019 to latest 12 monthsUS tile map of commercial electricity sales growth since 2019: Nebraska up 77.4%, Oregon 71.5%, Wyoming 65.1%, Virginia 63.3% and North Dakota 62.9%, while 14 jurisdictions declined.AK: 1.1AK1.1ME: -3.5ME-3.5VT: 2.7VT2.7NH: 0.1NH0.1WA: 15.9WA15.9ID: 12.2ID12.2MT: 3.3MT3.3ND: 62.9ND62.9MN: 2.7MN2.7IL: -6.9IL-6.9WI: 2.4WI2.4MI: -1MI-1NY: -4.1NY-4.1RI: 0.3RI0.3MA: -3.6MA-3.6OR: 71.5OR71.5NV: 27.9NV27.9WY: 65.1WY65.1SD: 11.6SD11.6IA: 10.5IA10.5IN: 18.9IN18.9OH: 37.3OH37.3PA: 0.3PA0.3NJ: -2.5NJ-2.5CT: -3.7CT-3.7CA: -0.6CA-0.6UT: 30.8UT30.8CO: 1.2CO1.2NE: 77.4NE77.4MO: 3.2MO3.2KY: 5.2KY5.2WV: 8.6WV8.6VA: 63.3VA63.3MD: -4MD-4DE: -4.1DE-4.1AZ: 40.0AZ40.0NM: 3.1NM3.1KS: 4.6KS4.6AR: -0.1AR-0.1TN: 1.7TN1.7NC: 3.6NC3.6SC: 23.5SC23.5DC: -10.4DC-10.4OK: 40.7OK40.7LA: -1.3LA-1.3MS: 1.4MS1.4AL: 0.2AL0.2GA: 25.9GA25.9HI: -9.2HI-9.2TX: 29.7TX29.7FL: 5.4FL5.4PR-10.4 to -3.5-3.5 to 0.30.3 to 3.13.1 to 11.611.6 to 30.830.8 to 77.4%

Source: U.S. EIA, Form EIA-861M (August 2026 release)

EIA's May 2026 analysis says Virginia's commercial sales grew by nearly 30.0 million MWh between 2019 and 2025, largely driven by data centers, with electric vehicles and building electrification also contributing (EIA Today in Energy). This report's calendar 2025 figure from the later EIA-861M file is 32.6 TWh; EIA's article used February 2026 preliminary data. In June 2024 EIA linked Texas growth to data centers and cryptocurrency mining, and North Dakota's 37% rise from 2019 to 2023 to large computing facilities (EIA).

Switchboards and overhead busway in a data center electrical room.
Illustrative photograph. Generated image, not a specific project.

Grid operators now plan for far more load: ERCOT requests reached 438 GW by June 2026

Interconnection requests and load forecasts are not consumption. They show what developers are asking for and what grid planners expect, and both have risen sharply since 2024. Each figure below is labelled with its publisher and date.

ERCOT, which runs most of the Texas grid, reported about 189 GW of large loads seeking interconnection on September 2, 2025, against 56 GW in September 2024, with about 69% data centers (ERCOT, September 2025). The total reached 410 GW on March 26, 2026, about 87% data centers (ERCOT, April 2026), and 438 GW at the June 2026 board update (ERCOT, June 2026). ERCOT's July 29, 2026 Senate briefing gave about 474 GW as of June 2026, about 90% data centers (ERCOT Senate briefing).

ERCOT large-load interconnection requests by date Download CSV
As ofLarge loads seeking interconnection (GW)Data center shareERCOT document
September 202456not statedBoard, Sep 22-23, 2025 (comparison figure)
December 202463not statedBoard, Dec 8-9, 2025 (comparison figure)
September 2, 2025189about 69%Board, Sep 22-23, 2025
November 18, 2025226about 73%Board, Dec 8-9, 2025
January 20, 2026232about 72%Board, Feb 9-10, 2026
March 26, 2026410about 87%Board, Apr 20-21, 2026
June 2026 (board update)438not statedBoard, Jun 1-2, 2026
June 2026 (Senate briefing)474about 90%Senate Business and Commerce, Jul 29, 2026
July 28, 2026: eligible for Batch Zero205not statedSenate Business and Commerce, Jul 29, 2026

Requests from loads of 75 MW or more; not commitments. Board and Senate figures for June 2026 differ in timing and scope.

Source: [21][22][23][24][25][26] Electric Reliability Council of Texas; Electric Reliability Council of Texas; Electric Reliability Council of Texas; Electric Reliability Council of Texas; Electric Reliability Council of Texas; Electric Reliability Council of Texas

Large loads seeking connection to the ERCOT grid

GW of requests at each ERCOT board update

Large loads seeking connection to the ERCOT gridLine chart of ERCOT large-load interconnection requests rising from 56 GW in September 2024 and 63 GW in December 2024 to 189 GW in September 2025, 410 GW in March 2026 and 438 GW in June 2026.0100200300400500GWSep 2024Dec 2024Sep 2025Nov 2025Jan 2026Mar 2026Jun 2026

Source: ERCOT board presentations, September 2025 to June 2026 (Internet Archive copies)

ERCOT closed its request-by-request process on July 10, 2026 and moved to a batch study called Batch Zero for loads of 75 MW or more. About 205 GW of large load was eligible for Batch Zero based on existing studies as of July 28, 2026. ERCOT's June 2026 board deck said the vast majority of requests had no studies submitted, and its Quarterly Stability Assessment expected about 3.9 GW of large load to energize in Q4 2026. ERCOT's September 2026 board deck moved large-load figures to a separate Batch Zero update that was not retrieved for this edition.

PJM's January 2026 load forecast projects RTO summer peak growth of 3.6% a year and net energy growth of 5.3% a year over ten years, with the summer peak at 222,106 MW in 2036 (PJM 2026 Load Forecast). Its January 2024 forecast had 1.6% and 2.3% (PJM 2024 Load Forecast). For 2039, the last year in the 2024 report, the 2026 forecast is 45,161 MW (23.7%) higher on summer peak and 419,658 GWh (37.4%) higher on energy. PJM lists data center load growth as an adjustment in most of its zones.

PJM load forecast, January 2024 report versus January 2026 report Download CSV
Forecast item2024 report (Jan 2024)2026 report (Jan 2026)Change
PJM RTO summer peak, 2034 (MW)176,822211,882+35,060
PJM RTO summer peak, 2039 (MW)190,752235,913+45,161
PJM RTO net energy, 2034 (GWh)1,021,9551,348,192+326,237
PJM RTO net energy, 2039 (GWh)1,120,9281,540,586+419,658
Average annual summer peak growth, next 10 years1.6%3.6%+2.0 points
Average annual net energy growth, next 10 years2.3%5.3%+3.0 points
Dominion zone summer peak, 2030 (MW), 2026 report onlynot compared31,939
Dominion zone net energy, 2036 (GWh), 2026 report onlynot compared297,069

2026 report values for 2034 and 2039 are derived from the data workbook (highest June to August monthly peak; sum of monthly energy).

Source: [18][19][20] PJM Interconnection; PJM Interconnection; PJM Interconnection

PJM summer peak forecasts for 2034 and 2039, two reports apart

MW, PJM RTO; January 2024 report versus January 2026 report

PJM summer peak forecasts for 2034 and 2039, two reports apartSlope chart: PJM's forecast 2034 summer peak rose from 176,822 MW in the 2024 report to 211,882 MW in the 2026 report, and the 2039 peak from 190,752 MW to 235,913 MW.2024 report2026 report2034 summer peak 176,822211,882 2034 summer peak2039 summer peak 190,752235,913 2039 summer peak

Source: PJM 2024 and 2026 Load Forecast Reports and 2026 data workbook (Internet Archive copies)

PJM's 2026 forecast is lower than its 2025 forecast in the near term through 2032; the 2028 summer peak is 4,414 MW lower. PJM cites updated electric vehicle and economic forecasts and a new rule that near-term large-load adjustments need firm commitments, with longer-term projects derated. EIA reports PJM now expects Dominion zone summer peak growth of 5.4% a year over ten years, down from 6.3% in the 2025 forecast (EIA).

NERC's 2025 Long-Term Reliability Assessment, published in January 2026, projects aggregated summer peak growth of over 224 GW over ten years, 69% more than the 132 GW in the prior year's assessment, and says new data centers account for most of the increase (NERC 2025 LTRA). NERC notes Texas data center projections were reduced by almost 50% of requested load to reflect how existing sites actually ramp.

Data center and large-load items in NERC's 2025 Long-Term Reliability Assessment Download CSV
Grid area (NERC 2025 LTRA)Data center or large-load itemValueHorizon
All NERC assessment areasTen-year summer peak demand growthover 224 GW (prior year: 132 GW)2026 to 2035
ERCOTForecast large-load interconnections45 GW, of which 23 GW data centersby 2030
ERCOTSummer peak total internal demand94,650 MW to 154,077 MW2026 to 2035
PJMSummer peak demand growth56 GW to 210 GWto 2035
PJMAnnual net energy growth4.8% per year (prior year: 2.3%)10 years
MISOData center load additions18 GWby 2035
WECCPlanned data centers as share of demand10% on average, up to 40% for some balancing authoritiesLTRA horizon
WECC-NorthwestPeak load increase driven by data centers6.6 GW (19%)10 years

Forecasts reflect load-serving entity submissions from mid-2025. ERCOT and PJM have since revised their forecasts.

Source: [17] North American Electric Reliability Corporation

Utility filings: 53.8 GW in Dominion's contract stages and 70,168 MW of Georgia data center projects

Utility filings with state commissions give the most granular public view of where data center load is being connected. They measure requested or contracted capacity, not electricity used, and the stages differ by utility.

Dominion Energy Virginia reported 53.8 GW of data center contracted capacity in July 2026: 32.4 GW under substation engineering letters, 9.4 GW under construction letters and 12.0 GW under signed Electric Service Agreements (Dominion Q2 2026 slides). The total was 16.5 GW in July 2023, so it rose 3.26 times in three years. Signed service agreements were 22.3% of the July 2026 total. Dominion told WTVR in October 2026 that about 12,000 MW of data center capacity is under contract in its retail territory (WTVR).

Dominion's 2026 IRP Update, filed October 15, 2026, reports about 25,000 MW of large-load delivery point requests as of February 2026 with connection dates through 2031, and models data center demand as seven large customer segments plus about 47 other data center customers (Dominion 2026 IRP Update). Using PJM's 2026 forecast, annual energy in the Dominion zone grows at 5.2% a year over 20 years; the PJM data workbook shows it doubling from 148,390 GWh in 2026 to 297,069 GWh in 2036 (PJM data workbook).

Dominion Energy Virginia data center contracted capacity by stage

GW; ESA = Electric Service Agreement, CLOA = construction letter, SELOA = substation engineering letter

Dominion Energy Virginia data center contracted capacity by stageGrouped bar chart of Dominion data center contracted capacity: signed service agreements rose from 5.8 GW in July 2023 to 12.0 GW in July 2026, while substation engineering letters rose from 8.7 GW to 32.4 GW.010.020.030.040.0GW5.828.7Jul 202310.211.027.4Dec 202510.411.129.5Mar 202612.09.432.4Jul 2026ESACLOASELOA

Source: Dominion Energy, second-quarter 2026 earnings call slides (July 31, 2026)

Georgia Power's Q1 2026 report to the Georgia Public Service Commission lists 12,400 MW of customer commitments across 31 large-load customers as of March 31, 2026, up from 3,600 MW at its October 2023 IRP Update, and a large-load pipeline of 73,100 MW through the mid-2030s (Georgia Power Q1 2026 report). Of the 113 projects in the attachment, 101 (89.4%) are labelled Data Center/Crypto, carrying 70,168 MW (95.9%) of announced load. Committed Data Center/Crypto projects number 26, with 11,750 MW. Georgia Power says 8,500 MW of committed load has broken ground.

Data center load named in Dominion Energy Virginia and Georgia Power filings Download CSV
Utility filingAs ofMeasureValue
Dominion Energy Virginia, Q2 2026 slidesJuly 2023Data center contracted capacity, all stages16.5 GW
Dominion Energy Virginia, Q2 2026 slidesDecember 2025Data center contracted capacity, all stages48.5 GW
Dominion Energy Virginia, Q2 2026 slidesMarch 2026Data center contracted capacity, all stages51.0 GW
Dominion Energy Virginia, Q2 2026 slidesJuly 2026Data center contracted capacity, all stages53.8 GW
Dominion Energy Virginia, Q2 2026 slidesJuly 2026Of which under Electric Service Agreements12.0 GW
Dominion Energy Virginia, 2026 IRP UpdateFebruary 2026Large-load delivery point requests through 203125,000 MW
Dominion Energy Virginia, 2026 IRP Update2026Data center customers in the forecast model7 named segments plus about 47 others
Georgia Power, Q1 2026 large load reportMarch 31, 2026Large-load customer commitments12,400 MW across 31 customers
Georgia Power, Q1 2026 large load reportMarch 31, 2026Committed load that has broken ground8,500 MW
Georgia Power, Q1 2026 large load reportMarch 31, 2026Large-load pipeline through the mid-2030s73,100 MW
Georgia Power, Q1 2026 large load reportMarch 31, 2026Data Center/Crypto projects in the pipeline (derived)101 of 113 projects, 70,168 MW

Contract stages and pipeline definitions differ by utility. Georgia's Data Center/Crypto count is derived from the redacted project attachment.

Source: [28][29][30] Dominion Energy Virginia, filed with the Virginia State Corporation Commission; Dominion Energy; Georgia Power Company, filed with the Georgia Public Service Commission

One data center campus in Georgia Power's filing asks for 120 MW to 3,500 MW

No national dataset reports the draw of individual data centers. Georgia Power's attachment, with names redacted, is the most detailed public list found: the median committed data center project asks for 240 MW.

Among Georgia Power's 26 committed Data Center/Crypto projects (contract or request for service), announced loads run from 120 MW to 1,429 MW, with a median of 240 MW. Across all 101 Data Center/Crypto projects in the pipeline the median is 481 MW, the largest is 3,500 MW, and 22 projects announce 1,000 MW or more. These are customer-announced loads at full ramp, not metered demand.

Announced load of Georgia Power Data Center/Crypto projects by stage, March 31, 2026 Download CSV
Georgia Power project stage (Data Center/Crypto segment)ProjectsAnnounced load (MW)Median per project (MW)Smallest (MW)Largest (MW)
Contract for Electric Service199,1492401201,429
Request for Service72,601300216693
Technical Review7558,4185501443,500
All Data Center/Crypto projects10170,1684811203,500

Announced load at full ramp as listed in the filing; project names redacted. Derived by this report from the attachment.

Source: [30] Georgia Power Company, filed with the Georgia Public Service Commission

Other filings give thresholds rather than averages. Dominion's new GS-5 rate class, effective January 2027, applies to customers with contracted or measured demand of 25 MW or more and a load factor of 75% or more. ERCOT's Batch Zero process covers loads of 75 MW or more, and ERCOT's December 2025 board deck noted that many requests exceed 1 GW per site. At the national level, LBNL's 2024 estimate equals an average draw of about 21.9 GW, and its 2030 Reference Case implies 148 GW of interconnection capacity at 50% utilization.

Duct banks, cable reels and a pad-mounted transformer on a data center construction site.
Illustrative photograph. Generated image, not a specific project.

What the new data center load means for electrical contractors

The filings show where utility-side and customer-side electrical construction is concentrated. Jobs, pay and construction spending for data center work are covered in a separate report.

The load is concentrated in a few service areas. Seven states account for 74.2% of national commercial sales growth since 2019, and Dominion's construction letters, which authorise utility construction, covered 9.4 GW of data center capacity in July 2026. Georgia Power reports 21 committed large-load projects have broken ground, ten of them online. Labour demand, wages and construction spending for this work are in the data center electrician report.

Forecasts in this report are not commitments. NERC, PJM and ERCOT all state that some large-load projects have slowed or failed to materialise in the near term while requests for later years keep rising.

How the benchmark is built

Dated ledger of official US data center electricity estimates

FormulaEach estimate listed with publication date, year covered, TWh, share and method; IEA US values derived as 45% x 415 TWh and 186.75 + 240 TWh

Inputs: fact sheet rows for LBNL 2024, LBNL 2025 Update, DOE, IEA (see table t1) (fact sheet rows)

Result: 192 TWh in 2024 (LBNL 2025 Update); 2030 forecasts from 426.8 TWh (IEA, derived) to 649 TWh (LBNL Reference Case)

The two most recent bottom-up estimates agree on 2024 within about 5 TWh (192 versus 186.8) but diverge by more than 200 TWh for 2030, mainly on accelerator shipments.

Limitations: IEA figures are derived from rounded shares; EPRI figures are quoted second hand by LBNL.

Implied LBNL Reference Case use in 2026

Formula192 TWh x 1.22 x 1.29

Inputs: rows for 192 TWh, 22% and 29% growth (derived d3, d4) (fact sheet rows)

Result: 302.2 TWh

On LBNL's central path, 2026 data center use would be more than 50% above 2024.

Limitations: Forecast; LBNL's rates are rounded and 2025 is partly projected.

Commercial-sector sales growth by state, 2019 to latest 12 months

Formulasum of Sep 2025 to Aug 2026 monthly sales minus calendar 2019 sales, by state

Inputs: EIA-861M state rows (derived d8 to d20) (fact sheet rows)

Result: US +176.0 TWh (12.9%); Texas +42.2 TWh; Virginia +34.2 TWh (63.3%); seven flagged states 74.2% of the national increase

Commercial growth is concentrated: Texas and Virginia alone supply 43.4% of it, while 14 jurisdictions sold less commercial electricity than in 2019.

Limitations: Sector class depends on utility billing; weather and non-data center growth are included; 2026 months are preliminary.

ERCOT large-load requests, year on year

Formula189 GW (Sep 2025) minus 56 GW (Sep 2024); 438 GW (Jun 2026) minus 189 GW

Inputs: ERCOT rows (derived d23 to d29) (fact sheet rows)

Result: +133 GW (3.4 times) in the year to September 2025; +249 GW in the following nine months

The request total grew faster in the nine months to June 2026 than in the full prior year, as data centers rose to about 90% of requests.

Limitations: No June 2025 ERCOT figure was retrieved, so the latest interval is nine months; requests are not commitments and most had no studies submitted.

PJM forecast revision for 2039, 2024 report versus 2026 report

Formula2026 report value minus 2024 report value for the same year

Inputs: PJM rows (derived d30 to d35) (fact sheet rows)

Result: Summer peak +45,161 MW (23.7%); net energy +419,658 GWh (37.4%)

Two years of forecast updates added more to PJM's 2039 energy outlook than the whole 307,600 GWh 15-year increase the 2024 report projected.

Limitations: The 2026 summer peak is derived from the monthly data workbook; it matches PJM's published 2036 and 2046 values.

Data center load named in Dominion and Georgia Power filings

FormulaDominion: 53.8 / 16.5 and 12.0 / 53.8; Georgia: count and MW of Data Center/Crypto rows in the Q1 2026 attachment

Inputs: Dominion and Georgia Power rows (derived d37 to d48) (fact sheet rows)

Result: Dominion 53.8 GW in July 2026 (3.26 times July 2023; 22.3% under signed agreements); Georgia 101 projects, 70,168 MW (95.9% of announced MW); 26 committed, 11,750 MW

In both utilities most of the named capacity is at early stages, and nearly all large-load pipeline megawatts in Georgia are data centers or crypto.

Limitations: Company figures; Georgia rows pair columns by order across pages, and the totals match the filing's 73,100 MW and 12,400 MW within rounding.

Get the calculations (CSV)

Where contractors differ

  1. US data centers used an estimated 192 TWh of electricity in 2024, 4.7% of total US electricity consumption (LBNL 2025 Update, June 2026).[1]
  2. LBNL estimates US data center electricity use grew 14% from 2023 to 2024 and projects 22% growth in 2025 and 29% in 2026 in its Reference Case.[1]
  3. Applying LBNL's growth rates to its 2024 figure implies about 302.2 TWh of US data center use in 2026 (derived, Reference Case).[1]
  4. LBNL's 2030 Reference Case is 649 TWh (11.8% of forecast US electricity), with a Compounded Uncertainty range of 521 to 843 TWh.[1]
  5. The LBNL December 2024 report estimated 176 TWh (4.4%) for 2023 and 76 TWh (1.9%) for 2018, and a range of 325 to 580 TWh (6.7% to 12.0%) for 2028.[3]
  6. IEA's Energy and AI report (2025) puts the US at 45% of 415 TWh of global data centre use in 2024, which implies about 186.8 TWh, and projects a US increase of around 240 TWh by 2030.[13][14]
  7. US commercial-sector retail electricity sales rose from 1,360.9 TWh in 2019 to 1,536.9 TWh in the 12 months ending August 2026, an increase of 12.9% (EIA-861M).[5]
  8. Virginia commercial-sector electricity sales rose 34.2 TWh (63.3%) between 2019 and the 12 months ending August 2026, 19.4% of the national increase (EIA-861M).[5]
  9. Oregon (+71.5%) and Nebraska (+77.4%) recorded the largest percentage gains in commercial electricity sales among the top 20 states by TWh growth between 2019 and the 12 months to August 2026.[5]
  10. ERCOT was tracking about 189 GW of large loads seeking interconnection on September 2, 2025, compared with 56 GW in September 2024; about 69% were data centers.[21]
  11. ERCOT tracked 438 GW of large-load requests at its June 2026 board update and told the Texas Senate about 474 GW as of June 2026, about 90% data centers.[25][26]
  12. PJM's 2026 forecast puts PJM RTO net energy at 1,540,586 GWh in 2039, 37.4% above the 1,120,928 GWh in its 2024 forecast for the same year.[19][20]
  13. NERC's 2025 Long-Term Reliability Assessment (January 2026) projects ten-year summer peak growth of over 224 GW across North America, 69% more than the 132 GW projected a year earlier, mostly from data centers.[17]
  14. Dominion Energy Virginia reported 53.8 GW of data center capacity in contract stages in July 2026, 3.26 times the 16.5 GW of July 2023; 12.0 GW was under signed Electric Service Agreements.[29]
  15. Georgia Power's Q1 2026 large-load attachment lists 101 Data Center/Crypto projects with 70,168 MW of announced load, 95.9% of the 73,130 MW listed.[30]

In short

  • Lawrence Berkeley National Laboratory (LBNL) estimates US data centers used 192 TWh of electricity in 2024, 4.7% of national consumption, up from 176 TWh (4.4%) in 2023 in its December 2024 report.
  • LBNL's June 2026 Reference Case puts 2030 data center use at 649 TWh, or 11.8% of forecast US electricity, with a scenario range of 521 to 843 TWh (9.5% to 15.3%).
  • No federal agency meters data center electricity directly; every national figure in this report is a model estimate, and EIA records data center load inside commercial and industrial sales.
  • EIA-861M data show US commercial-sector sales up 176.0 TWh (12.9%) between calendar 2019 and the 12 months ending August 2026; Texas (+42.2 TWh) and Virginia (+34.2 TWh) account for 43.4% of that growth.
  • Seven states named as data center hubs (Virginia, Texas, Georgia, Ohio, Arizona, Oregon, Iowa) account for 74.2% of national commercial sales growth over the period.
  • ERCOT's large-load request total rose from 56 GW in September 2024 to 189 GW in September 2025 and 438 GW at its June 2026 board update; ERCOT put the data center share at about 90% in June 2026.
  • PJM's January 2026 load forecast puts the 2039 RTO summer peak at 235,913 MW, 23.7% above the 190,752 MW in its January 2024 forecast for the same year.
  • Utility filings show Dominion Energy Virginia with 53.8 GW of data center capacity in contract stages in July 2026 (12.0 GW under signed service agreements) and Georgia Power listing 101 Data Center/Crypto projects totalling 70,168 MW in its March 2026 pipeline.

What people search for

How much power does a data center use?

Large campuses now ask utilities for hundreds of megawatts each. In Georgia Power's Q1 2026 filing, committed data center projects announce a median of 240 MW and the largest pipeline project 3,500 MW. Dominion's large-load rate class starts at 25 MW. Nationally, LBNL's 192 TWh for 2024 equals an average draw of about 21.9 GW across all US data centers.

What percentage of US electricity do data centers use?

LBNL estimates 4.7% in 2024 (192 TWh), up from 4.4% in 2023 and 1.9% in 2018. Its June 2026 Reference Case reaches 11.8% of US electricity by 2030, within a range of 9.5% to 15.3%.

Which states have the most data center electricity demand?

No federal series reports data center use by state. Measured commercial sales growth since 2019 is largest in Texas (+42.2 TWh) and Virginia (+34.2 TWh), followed by Ohio, Georgia, Arizona and Oregon. EIA attributes Virginia's growth largely to data centers, and PJM's Dominion zone serves the largest data center concentration in the world, according to EIA.

Are data centers raising electricity demand?

Federal and grid sources say yes. EIA says data center electricity use is driving demand growth that averaged 1.7% a year from 2020 to 2025, against 0.1% from 2005 to 2019. The IEA says data centres supplied around half of US demand growth in 2025. NERC says new data centers account for most of the projected 10-year rise in North American peak demand.

Common questions

How much electricity did US data centers use in 2024?

About 192 TWh, or 4.7% of US electricity consumption, according to LBNL's 2025 Update published in June 2026. The estimate excludes cryptocurrency mining.

How much electricity did US data centers use in 2023?

LBNL's December 2024 report estimated 176 TWh, 4.4% of US consumption. The 2025 Update revised earlier years slightly downward.

How much electricity will data centers use by 2030?

LBNL's Reference Case is 649 TWh in 2030, 11.8% of forecast US electricity, with a range of 521 to 843 TWh. IEA's 2025 Base Case implies about 426.8 TWh for the US.

What did the 2024 LBNL report forecast for 2028?

A range of 325 to 580 TWh, or 6.7% to 12.0% of US electricity in 2028. The 2025 Update's 2028 Reference Case is 464 TWh.

How fast is US data center electricity use growing?

LBNL estimates 14% growth from 2023 to 2024 and projects 22% in 2025 and 29% in 2026 in its Reference Case, then a 21% compound annual rate to 2030.

Does EIA publish a data center electricity figure?

Not in the releases reviewed. EIA counts data centers inside commercial and industrial retail sales; its October 2026 Short-Term Energy Outlook forecasts commercial demand, which includes data centers, to grow 2.8% in 2027.

How much have commercial electricity sales grown since 2019?

US commercial-sector retail sales rose 176.0 TWh, or 12.9%, from 1,360.9 TWh in 2019 to 1,536.9 TWh in the 12 months ending August 2026 (EIA-861M).

How much large load is waiting to connect in Texas?

ERCOT tracked 438 GW of large-load interconnection requests at its June 2026 board update, up from 56 GW in September 2024. About 205 GW was eligible for its Batch Zero study as of July 28, 2026.

How much data center capacity has Dominion Energy contracted in Virginia?

Dominion reported 53.8 GW of data center capacity across its three contract stages in July 2026, of which 12.0 GW was under signed Electric Service Agreements.

How much has PJM raised its load forecast?

PJM's January 2026 forecast for 2039 is 235,913 MW of summer peak and 1,540,586 GWh of energy, 23.7% and 37.4% above its January 2024 forecast for the same year.

Get the data

Every table in this report is available as a CSV under CC BY 4.0. The fact sheet lists each value with its source URL and access date.

Cite this report

The figures to cite first

  1. US data center electricity use was an estimated 192 TWh in 2024, 4.7% of US electricity (LBNL 2025 Update, June 2026).[1]
  2. LBNL's 2030 Reference Case for US data centers is 649 TWh, 11.8% of forecast US electricity, with a 521 to 843 TWh range (LBNL, June 2026).[1]
  3. US commercial electricity sales grew 176.0 TWh from 2019 to the 12 months ending August 2026, led by Texas (+42.2 TWh) and Virginia (+34.2 TWh) (EIA-861M, October 2026 release).[5]

Quotable figures

  • US data centers used an estimated 192 TWh of electricity in 2024, 4.7% of total US electricity consumption, according to Lawrence Berkeley National Laboratory's 2025 Update (June 2026).[1]
  • LBNL's Reference Case projects US data center electricity use of 649 TWh in 2030, 11.8% of forecast US electricity, within a range of 521 to 843 TWh.[1]
  • US commercial-sector electricity sales rose 176.0 TWh (12.9%) between 2019 and the 12 months ending August 2026, and Texas and Virginia supplied 43.4% of that growth (EIA-861M).[5]
  • Virginia's commercial electricity sales rose 63.3%, from 54.0 TWh in 2019 to 88.2 TWh in the 12 months ending August 2026 (EIA-861M).[5]
  • ERCOT tracked 438 GW of large-load interconnection requests in Texas at its June 2026 board update, against 56 GW in September 2024.[25][21]
  • PJM's January 2026 forecast for 2039 net energy, 1,540,586 GWh, is 37.4% higher than its January 2024 forecast for the same year.[19][20]
  • Dominion Energy Virginia reported 53.8 GW of data center capacity in contract stages in July 2026, including 12.0 GW under signed Electric Service Agreements.[29]

Summary for editors

US data centers used an estimated 192 TWh of electricity in 2024, 4.7% of national consumption, according to Lawrence Berkeley National Laboratory's June 2026 update. Its central case reaches 649 TWh, or 11.8% of US electricity, by 2030. An Electrical Contractors and Wiring Data Desk analysis of EIA-861M data finds US commercial electricity sales rose 176.0 TWh between 2019 and the 12 months ending August 2026, with Texas and Virginia supplying 43.4% of the increase and Virginia's commercial sales up 63.3%. Grid operators are planning for more: ERCOT tracked 438 GW of large-load requests in June 2026, up from 56 GW in September 2024, and PJM's 2026 forecast for 2039 energy is 37.4% above its 2024 forecast. Dominion Energy Virginia reported 53.8 GW of data center capacity in contract stages, and Georgia Power's filing lists 101 data center or crypto projects totalling 70,168 MW. Contracted capacity and requests are not consumption; every national figure is a model estimate.

Headlines the data supports

  • US data centers used 192 TWh in 2024, 4.7% of the nation's electricity
  • Texas and Virginia supplied 43.4% of US commercial power sales growth since 2019
  • Texas grid large-load requests hit 438 GW, up from 56 GW in September 2024
  • PJM's 2039 energy forecast is now 37.4% higher than two years ago
  • Virginia commercial electricity sales up 63.3% since 2019 as data centers expand

Citation

Electrical Contractors and Wiring. (2026). Data center power consumption in the US: official estimates, state sales and grid forecasts. Retrieved from https://electricalcontractorsandwiring.com/data/data-center-power-consumption/

Reuse

Data and tables are licensed CC BY 4.0. Attribution: “Source: Electrical Contractors and Wiring, Data center power consumption in the US: official estimates, state sales and grid forecasts” with a link to this page.

How we built this report

Source selection: national electricity estimates come from LBNL's bottom-up model (DOE-funded, Tier 1), checked against IEA (Tier 2). Measured data come from EIA's Form EIA-861M state sales file (August 2026 release, the latest at access). Forecasts come from grid operators (ERCOT, PJM), NERC and utility filings with state commissions. Consultancy figures (EPRI) appear only as quoted by LBNL and are never headline figures. Every source was opened on 2026-11-03 or 2026-11-05 and a copy saved in raw/.

Inclusion and exclusion: measured sales and model estimates are kept separate from forecasts, requests and contracted capacity, and each forecast is labelled with its publisher and date. Pages that blocked automated access (ERCOT, PJM by DNS failure, Virginia JLARC, EPRI, Virginia Business, several news sites) were retried with a browser user agent, then taken from Internet Archive snapshots, whose URLs are cited; pages with no snapshot are listed in excluded.md. Bill impacts, PJM capacity prices, transformer supply, utility rankings, reliability, and data center jobs and pay are covered in other reports and linked, not repeated.

Conflicting numbers: where the same quantity appears in two documents (ERCOT's June 2026 board figure of 438 GW and its Senate figure of about 474 GW; EIA's 30.0 million MWh for Virginia against 32.6 TWh in the later EIA-861M file), both are shown with dates. LBNL's 2025 Update supersedes its 2024 report for 2024 onward; the 2024 report is kept for 2018 and 2023 and its 2028 range.

Derived metrics: state growth is the sum of 12 monthly EIA-861M sales (September 2025 to August 2026) minus calendar 2019 sales, by sector. PJM 2026 values for 2034 and 2039 are the highest June to August monthly peak and the sum of monthly energy in PJM's data workbook; this method reproduces PJM's published 2036 and 2046 figures exactly. Georgia Power Data Center/Crypto counts pair the attachment's Segment column with its Stage and Announced Load columns by row order; the resulting totals (73,130 MW and 31 committed customers with 12,357 MW) match the filing's 73,100 MW and 12,400 MW. All formulas and inputs are in derived_metrics.csv and scripts/.

Limitations: data center electricity is not metered nationally; EIA sector classes depend on utility billing, so data center load can sit in commercial or industrial sales; sales are not weather-normalised and 2026 months are preliminary. Interconnection requests, pipelines and contracted capacity overstate likely load, and grid operators have cut near-term forecasts as some projects slipped. Georgia Power's segment label combines data centers and crypto mining. A Georgia Power Q2 2026 report, ERCOT's September 2026 Batch Zero update and Dominion's Q3 2026 slides could not be retrieved for this edition. This report is not investment, legal or engineering advice.

Last updated 2026-11-05. EIA-861M is checked monthly (next release end of November 2026); LBNL, PJM, NERC and utility filings are checked as new editions appear.

This report presents published data with its limitations. It is not legal, financial or investment advice.

Sources by tier

Tier 1: primary and official sources (26)

Tier 2: trade bodies, market research, company data (5)

Tier 3: journalism and expert commentary (1)

Free newsletter